Downloads

Related Links

Medical Shelters & Hospital Surge Capacity

25-Bed Hub and Spoke

Rapid deployable infrastructure system provides support for 25 surge capacity patients. Complete with power generation, heating and cooling, and water distribution. Free-standing and sets up in 2 hours. System only needs fuel, water source and oxygen to be operational. System can be augmented with medical equipment and supply sets to provide for a total turnkey solution to surge hospital capacity. Hub and Spoke complex has a center core that acts as a control point when joined with open end boots. Design promotes efficient traffic flow and improved utilization of staffing resources.

  • Life cycle management and BIOMED services available
  • Non-trailer based system can be stored and delivered from a nationwide system
  • Trailer based system with on-board power or mobile power sets available
  • Deployment technical support available

Includes

  • Rapid deploying shelters
  • Boot connectors
  • Door kits
  • Lighting
  • Complete water system including showers and sinks
  • Chairs, tables, desks
  • Storage units
  • Waste containers
  • Heating
  • Cargo Trailer with 20kW Generator
  • Fire extinguishers